Sunday, 18 December 2016
Saturday, 17 December 2016
Wednesday, 7 December 2016
Wednesday, 30 November 2016
Wednesday, 23 November 2016
Monday, 21 November 2016
Sunday, 13 November 2016
Introduction
Fico is component of ERP.which is integrated with various modules like MM,SD,PP and HR.
FI means Financial accounting which is used external reporting and CO means controlling used for
internal reporting inorder to reduce the expenses occuring in company.
FI means Financial accounting which is used external reporting and CO means controlling used for
internal reporting inorder to reduce the expenses occuring in company.
Product Costing & COPA
PRODUCT COSTING SCENARIO
Bill of Material
INK - 1LTR * RS 20 = 20
PLASCTIC - 1KG * RS 30 = 30
---
50
MATERIAL OVERHEAD - 5
----
55
----
ROUTING
LABOUR - 6HRS * RS 3 (PER HOUR) = 18
MACHINE - 8HRS * RS 2 (PERHOUR) = 16
CLEAN - 2HRS * RS 3 (PERHOUR) = 6
----
38
CONVERSION OVERHEAD 4
----
42
----
BREAK UP COMPONENTS
RAWMATERIAL - 50
LABOUR - 18
MACHINE - 16
CLEANING - 6
MOH - 5
COH - 4
----
FINAL COST 9 9
Configuration Seetings for above Example (material cost estimate with qty structure)
Define Calcuation Base (KZB2)
Define Percentage Overhead Rate (KZZ2)
Define Quatity Based Overhead (KZM2)
Define Credits (KZE2)
Define Costing Sheet (KZS2)
Define Cost Component Structure (OKTZ)
Define Costing Type (OKKI)
Define Valuation Variant (OKK4)
Define Date Control (OKK6)
Define Qty Structure Control (OKK5)
Define Transfer Control (OKKM)
Define Costing Variant (OKKN)
Creation of Material Mater (MM01)
Creation of Purchase Order (ME21n)
Goods Recipt (MIGO)
Create Bill of Material (CS01)
Maintain Output Plan to Production Cost Center (KP26)
Create Work Center (CR01)
Create Routing (CA01)
Standard Cost Estimate with Quatity Structure (CK11N)
Price Update (CK24)
Bill of Material
INK - 1LTR * RS 20 = 20
PLASCTIC - 1KG * RS 30 = 30
---
50
MATERIAL OVERHEAD - 5
----
55
----
ROUTING
LABOUR - 6HRS * RS 3 (PER HOUR) = 18
MACHINE - 8HRS * RS 2 (PERHOUR) = 16
CLEAN - 2HRS * RS 3 (PERHOUR) = 6
----
38
CONVERSION OVERHEAD 4
----
42
----
BREAK UP COMPONENTS
RAWMATERIAL - 50
LABOUR - 18
MACHINE - 16
CLEANING - 6
MOH - 5
COH - 4
----
FINAL COST 9 9
Configuration Seetings for above Example (material cost estimate with qty structure)
Define Calcuation Base (KZB2)
Define Percentage Overhead Rate (KZZ2)
Define Quatity Based Overhead (KZM2)
Define Credits (KZE2)
Define Costing Sheet (KZS2)
Define Cost Component Structure (OKTZ)
Define Costing Type (OKKI)
Define Valuation Variant (OKK4)
Define Date Control (OKK6)
Define Qty Structure Control (OKK5)
Define Transfer Control (OKKM)
Define Costing Variant (OKKN)
Creation of Material Mater (MM01)
Creation of Purchase Order (ME21n)
Goods Recipt (MIGO)
Create Bill of Material (CS01)
Maintain Output Plan to Production Cost Center (KP26)
Create Work Center (CR01)
Create Routing (CA01)
Standard Cost Estimate with Quatity Structure (CK11N)
Price Update (CK24)
Interview Questions
FI INTERVIEW QUESTIONS
- DIFFERENCE BETWEEN ONE TIME VENDOR AND REGULAR VENDOR?
- SEGMENTS AVILABLE IN VENDOR MASTER RECORD?
- EXPLAIN ABOUT RECONSILIATION ACCOUNT?
- WHAT IS DUNNING AREA AND DUNNING LEVELS?
- EXPLAIN ABOUT FI-MM INTEGRATION WITH ACCOUNTING ENTRIES?
- EXPLAIN ABOUT FI-SD INTEGRATION WITH ACCOUNTING ENTRIE?
- DIFFERENCE BETWEEN MOVING AVERAGE AND STANDARD PRICE ?
- IN WHICH METHOD WE WILL MAINTIAN PERCENTAGE FOR CALCULATING DEPRECIATION?
- EXPLAIN ABOUT CREATION OF DEP KEY IN DETAIL?
- HOW DOES DATA COMES TO ASSIGNMENT FIELD IN GENERAL LEDGER?
CO INTERVIEW QUESTIONS
- IN HOW MANY WAYS WE CAN CALCULATE INDIRECT OVERHEAD EXPENSES IN PRODUCT COSTING?
- HOW DOES COST AND REVENUE FLOWS TO PROFIT CENTER FROM MM AND SD?
- EXPLAIN DIFFERENCE BETWEEN 3KEH AND 3KEI?
- WHAT IS T-CODE USED TO MAINTAIN DEFAULT PROFIT CENTER,COST CENTER WITH RESPECTIVE COST ELEMENT?
- WHAT ARE PRIMARY AND SECONDARY COST ELEMENT CATEGORIES?
- DIFFERENCE BETWEEN ACCOUNT BASED COPA AND COSTING BASED COPA?
- IS IT REQUIRED TO MAINTAIN DERIVATION RULES WHEN YOU CREATE USER DEFINED CHARACTERASTICS?
- HOW ACTUAL VALUES WILL FLOW TO COPA FROM SD, MM ,COST CENTER, INTERNAL ORDER AND PROJECT SYSTEM?
Tables & T-codes
FI - TCODES
ASSET ACCOUNTING
Copy reference chart of Dep EC08
Assign chart of Dep to company code OAOB
Define Number Range Interval AS08
Define Asset Class OAOA
Determine Depreciation Area in Asset Class OAYZ
Deactivate Asset Class for Chart of Dep AM05
Specify amount for Low value asset OAYK
Specify Rounding of Net Book Value OAYO
Specify Change Over Amount OAYJ
Specify Memo Value for Depreciation OAYI
Specify Asset Class with out Memo Value OAAW
Creation of Dep Key AFAB
Assign GL Accounts AO90
Specify Posting Key for Asset Posting OBYD
Assign Input Tax Indicator to NON-Tax OBCL
ASSET ACCOUNTING
Copy reference chart of Dep EC08
Assign chart of Dep to company code OAOB
Define Number Range Interval AS08
Define Asset Class OAOA
Determine Depreciation Area in Asset Class OAYZ
Deactivate Asset Class for Chart of Dep AM05
Specify amount for Low value asset OAYK
Specify Rounding of Net Book Value OAYO
Specify Change Over Amount OAYJ
Specify Memo Value for Depreciation OAYI
Specify Asset Class with out Memo Value OAAW
Creation of Dep Key AFAB
Assign GL Accounts AO90
Specify Posting Key for Asset Posting OBYD
Assign Input Tax Indicator to NON-Tax OBCL
Contact
FOR ONLINE AND CLASS ROOM TRAINING FOR SAP FICO.
CONTACT :
EMAIL - VENKATRANADHEER.FICO@GMAIL.COM
MOBILE - 9902312118
Subscribe to:
Comments (Atom)